x
earth

CUSTOMIZE YOUR EXPERIENCE

Close
Change Language: English Region: Americas

Shangdong Agriculture Bank – China

The Project
The offsite backup data center building has six floors; one floor underground and five floors above ground, with a total of 44,200 square feet of construction area. The disaster recovery center and data offsite storage centre located on the first and second floors are connected to two different telecom operators by 6.2 miles of OM3 fiber cable to ensure the network connection is ready to operate 24/7. 88 storage, equipment and server racks are connected by 335 PowerCat 6 24 port copper patch panels, 200 24 port fiber patch panels and 5000 fiber patch cords, all working together to ensure the total reliability of the infrastructure responsible for the important backup of the bank’s data. In an emergency situation, the backup center could also take over the responsibility of running the whole bank system – just one more reason why a reliable infrastructure solution was essential.

Why Choose Molex?
Due to the swift development of Shandong Agriculture Bank, the stability and safety of the data operation and storage became more and more important; therefore the establishment of the offsite backup centre also became significantly important for the bank. The cabling system then becomes the nervous system for the backup brain, so a structured cabling system which could 100% guarantee the operation of the disaster recovery center was undeniably the most important aspect for the customer…

To read more, please download the full case study using the link.

Download